Spirited Energy
It needs heat that works twice. Spirited Energy 2.0 — soil, water, energy — same dual ledgers as the master report.
1 / 18 · 12 Aug 2026Spirited Energy
5,096 MW
23 January 2024 peak PD. Brandon gas: outages/deratings in 3 of 10 highest winter events PD.
2 / 18Spirited Energy
$3.0B · 750 MW nameplate
20-yr $4.5–6.9B
$1.95B gross · dual ledger
20-yr $1.5–1.8B
Spirited Energy
MWth never sums into MW electric. Effluent stage 50 MWth → +38 MW net; compute reject (95 MWth) gated, load netted first.
Retired composite 895 MW is forbidden.
Spirited Energy
Spirited Energy
Pass gate: reference gross $2,834/kW beats gas nameplate $4,000/kW — no ITC, no derate assumed. Net $2,180; derate sensitivity $5,714.
Spirited Energy
Non-overlapping. Savings $2.7–5.4B.
Spirited Energy
3-of-10 is an audit request — not a flat 30% derate-as-fact.
Spirited Energy
Surplus floor ≥35%, first lien. Plan yield 130–320 t/yr against a ~3,050 t/yr external gap — no single measure closes it, ours included.
Spirited Energy
Heat customer · grid headroom · contracted buyer. Missing any gate → 0 MW.
Spirited Energy
Spirited Energy
Spirited Energy
Emerson spine, binational nutrients, gates — metadata in docs/sources.md.
Spirited Energy
assumptions.yaml + 71 automated testsSpirited Energy
15 / 18
Spirited Energy
Spirited Energy
Authorize the effluent-stage heat pilot (Order 6) and public 10–20 kW heat-first compute (Order 7) on separate tracks, with public metered filings. Approving these costs little; approving $3.0B gas forecloses the alternative.
17 / 18Spirited Energy
Governing package: /report/ · Numbers: assumptions.yaml